Book 24, Question 96
How do builders dig a deep basement without the sides caving in?
Builders dig deep basements without cave-ins by sloping the walls, cutting steps, or using braces and shields to hold back the soil.
Before digging, workers often drive strong steel beams or build concrete walls around the edge to hold back the soil. As they dig, they add braces across the hole. Pumps remove groundwater that would leak in. Trucks haul away the dirt on ramps.
Watch the videoWatch on YouTubeSee the series on Amazon
Quick answers
When is protection needed?
Digs 5 feet deep or more need a protective system, unless cut in stable rock.
What is shoring?
Using supports, such as hydraulic braces, to keep soil from moving.
Who designs deep systems?
For digs 20 feet or deeper, a registered professional engineer.
Source: osha.gov
More fun facts
- Digs 5 feet deep or more need a protective system to stop cave-ins, unless they are cut entirely in stable rock.
- For digs 20 feet deep or more, the protective system must be designed by a registered professional engineer.
- Sloping means cutting the walls back at an angle that leans away from the hole.
- Benching means cutting the sides into a series of flat steps.
- Shoring uses supports, such as aluminum hydraulic braces, to keep the soil from moving.
- Shielding uses trench boxes or other supports to protect workers from cave-ins.
- Dug up soil must be kept at least 2 feet back from the edge, and the hole must be checked again after rain.
Sources: osha.gov
Questions kids ask
Who checks a deep dig each day?
A trained competent person must inspect it daily before workers go in, and again whenever conditions change.